Method Statement For Erection And Dismantling Of Slab Formwork
Method Statement For Erection And Dismantling Of Slab Formwork For Pep 20, pep 30 slab props made of steel with high load bearing capacity and low weight shall be used for third floor slab and on wards. all the manufacturer’s details and instructions shall be followed for erection and dismantling striking of formwork. Safe work method statement for formwork process. it is advisable to mark the weight of large prefabricated sections of formwork so that the crane’s lifting capacity is not exceeded at the working radius. a lifting point is usually provided. in order to prevent distortion, a spreader or lifting beam should be used.
Method Statement For Erection And Dismantling Of Slab Formwork erection. do not deviate from layout drawings when erecting formwork without the approval of a qualified designer. be certain that all wall ties are in place and secured as per manufacturer’s recommendations. do not weld, bend or otherwise alter wall ties as it may seriously reduce their strength. This document provides a method statement for formwork erection and dismantling for a construction project. it outlines procedures for quality control, procurement, fabrication, testing, contingencies, health and safety. the purpose is to demonstrate the contractor's commitment to quality and assure the client that contract requirements will be met. responsibilities are defined for. 2.5 n mm 2. lateral parts of the formwork for all structural members can be removed. 70% of design strength. interior parts of formwork of slabs and beams with a span of up to 6m can be removed. 85% of design strength. interior parts of formwork of slabs and beams with a span of more than 6m can be removed. Method statement illustrations the drawings and or photographs contained in this method statement are for illustrative purposes only application design. all local and federal requirements must be followed when erecting formwork and shoring, placing concrete and stripping equipment. if you have any questions regarding your erection drawings, please.
Comments are closed.